Windsor Road, Temporary Access Road

Due to residential development being built ahead of the proposed new local roads, a temporary access road needed to be constructed off the main highway.
NA Group were appointed for the project and we completed the following works:

Project Challenges

Resolving the Challenges

NA Group resolved the challenges by detailed planning and phasing of the works throughout the project. The delay due to the flooding was resolved by adjusting the plan to catch up on time lost and by utilising on-call experienced staff. This ensured that the different stages of the project flowed smoothly, ensuring that the project was completed on time.

Key Outcomes

An access road was completed successfully for the new residents. All aspects of the project complied with the Roads and Maritime Services (RMS) specifications. The project was safely completed with zero incidents or accidents.