Contact us today to discus your project needs. | 1300 627 623

Our Facilities

Our Facilities

At NA Group, our facilities have been purpose-built to meet the demands of critical infrastructure works, emergency response, and large-scale road maintenance programs. Everything we do is focused on minimising downtime, increasing efficiency, and delivering consistent, high-quality outcomes for our clients. By investing in the right equipment, technology, and resources on site, we remove the need to rely on third-party suppliers and can respond quickly to any situation. Whether it’s a scheduled civil project or an after-hours emergency, our in-house capabilities give us complete control over logistics, materials, and response times.

Our Location

The NA Group depot is strategically located in Padstow, in Sydney’s south-west, providing quick and convenient access to all areas of the city. Positioned near key arterial corridors including the M5, M4 and M7 motorways, our location allows us to deploy crews and equipment efficiently across Greater Sydney. Whether it’s a planned road project or an urgent call-out, our team can reach job sites promptly and reliably thanks to our centralised base.

By choosing Padstow as our operational base, we’ve ensured our clients benefit from reduced lead times, faster mobilisation, and greater flexibility on every project.

24/7 Workshop Support

Our on-site workshop operates around the clock to support our fleet and field crews. This ensures that any issues can be addressed immediately, whether it’s preventative maintenance or urgent repairs. Having this facility in-house keeps our teams and equipment on the road and ready for action without unnecessary delays.

Materials Holding Bays

We maintain two key material holding bays to support our concrete and spray seal operations:

Sand and Aggregate Bay

This is where we prepare our daily pre-blend mixes, ensuring that our concrete is always fresh, compliant, and suited to the specifications of each project.

DGB Storage Bay

Dedicated to supporting our spray seal division, we stock a full range of DGB blends that meet the current transport specification and are available at all hours.

Cement and Concrete Supply

Our facility includes cement storage containers holding various mix materials, including high early strength concrete and sand/cement blends. This allows us to supply reliable, compliant mixes directly to our mobile batching units and project sites as needed.

Pug Mill Operations

Our pug mill is one of the most important additions to the NA Group fleet and plays a key role in supporting our emergency response and road maintenance services. Located on site and fully integrated into our operations, the pug mill allows us to produce stabilised materials quickly and to specification, with full control over moisture content and mixing consistency.
It is ideal for blending road base materials such as DGB and cement-treated blends, ensuring strong, durable outcomes for pavement repairs, road reinstatements, and stabilisation works. The pug mill can be deployed for both planned and reactive jobs, giving us the ability to respond to asset failures or major repairs at short notice.
By producing stabilised materials in-house, we reduce our reliance on external suppliers and ensure consistent material quality across all projects. This helps us maintain tighter project timelines, meet specification requirements, and deliver dependable results regardless of site conditions.

Emergency Bay and Rapid Response

Our emergency bay is a dedicated area for quick mobilisation during urgent callouts. Whether it’s a failed pit, a missing lid, or a safety hazard on the road, our crews can be loaded and deployed quickly with everything they need to complete the job. We stock a full range of components including double lids, single lids, v drains, and other compliant items ready to go.

Fleet and Equipment On Site

Everything we need to deliver our services is owned and operated in-house. Our fleet includes excavators, tippers, trucks, semi-flocks, mobile batching units, pug mills, and cement containers. This ensures we maintain full control over availability, compliance, and project timelines from start to finish.