Broken stormwater pipes and road surface collapsed. Civil works included replacement of 11m stormwater pipe, poured concrete footings for suspended road slab and overlaid with steel plates along with pouring new concrete road slabs and realignment of kerb and gutter.
Kevin Badger
Program Manager
Ventia Boral Amey Joint Venture