Talk with the team that knows
how to deliver 1300 627 623

T: 02 9781 1400    E: info@naroads.com
A: 55 Davies Rd, Padstow NSW 2211

NA Group on TikTok  NA Group on Instagram  NA Group on Facebook  NA Group on LinkedIn

SERVICE: Concrete

Nothern Beaches B-Line Program

The Northern Beaches B-Line Program (NBBP) was created to make bus travel easier, more reliable and comfortable along the north-south corridor between Mona Vale and Neutral Bay. The project involved several aspects including the addition of new facilities such as commuter car parks, traffic light phasing and tidal flow to improve bus journeys and reduce traffic flow. NA Group was appointed to replace and upgrade parts of the existing stormwater drainage system and complete concrete slab replacement utilising high early strength fast setting concrete.


Project Challenges

Working at night in a residential area on a busy arterial route.


Resolving the Challenges

NA Group resolved the challenges of the project with detailed planning and phasing of the works throughout the project. By working closely with TfNSW, we ensured that the different stages of the project flowed smoothly and that any unexpected problems were resolved efficiently and successfully.


Key Outcomes

The replacement and upgrade of the existing stormwater drainage system, and the lay of concrete was successfully accomplished to allow TfNSW to complete works to the Northern Beaches B-Line Program. The project was safely completed with zero incidents or accidents.

Concrete Services

<<Back to projects

“NA Group resolved the challenges of the project with detailed planning and phasing of the works throughout the project.”

Location: Sydney Northern Beaches

Sydney Harbour Bridge, Ennis Road on ramp

READ MORE

Motorway Concrete Slab Replacement

READ MORE

Remote Concrete Services

READ MORE

Muswellbrook Bridge Replacement Stitch Pour

READ MORE
BACK TO TOP